Tesla has been seeking to broaden Gigafactory Texas since its opening, however the scope of the electrical car automaker’s plans hasn’t been precisely clear. Now, Tesla has filed official paperwork for a number of growth tasks, set to yield large will increase to manufacturing capability, floor space and the attain of the manufacturing facility’s varied tasks.
A submitting dated January 9 exhibits that Tesla is planning to take a position $717 million into growth tasks to assemble buildings masking an extra 1.4 million sq. ft, in accordance with a report from Austin Enterprise Journal (through CNBC). The filings, submitted to the Texas Division of Licensing and Regulation, present plans for a variety of developments, together with battery cell testing, manufacturing, cathode manufacturing, drive models, and a die store, all alongside different plans nonetheless.
The growth plans embrace 4 separate buildings, and whereas the main points should be topic to alter, the mission will ultimately lead to a large overhaul of the plant’s present operations. Tesla has filed for the buildings as new development tasks, for “floor up and full inside end out of the manufacturing facility.”
In accordance with the submitting, Tesla’s largest new constructing will cowl 693,093 sq. ft and has been dubbed “Cell 1.” The Cell 1 constructing is predicted to value $368 million, with development set to run from January 23, 2023, to February 12, 2024.
The second-largest constructing is listed with a floor space of 423,032 sq. ft and can embrace an $85 million funding to finish. Known as “Drive Unit,” the constructing will start development on February 6, 2023, lasting till January 15, 2024.
The subsequent-largest constructing is aptly-named “Cathode,” and assuming they’re the identical mission, it was initially reported final February after Tesla filed for as much as 36 acres. Austin Enterprise Journal notes that it isn’t but clear if this is identical constructing that was detailed in a February 2 submitting final yr, although the same cathode naming conference would counsel that it’s. Stories confirmed that Tesla had already begun development on this mission final August.
Lastly, the smallest of Tesla’s 4 new buildings is the “Cell Check Lab,” which is simply rated for two,560 sq. ft, or the scale of a median espresso store. As for prices, the Cell Check Lab will likely be priced round $3.7 million, with the development mission operating from January 30, 2023, to August 25, 2023.
Tesla additionally filed for a 174,979-square-foot growth mission dubbed “Plastics” in December, with development anticipated to start late final month. Upon completion of the growth tasks, the entire floor footprint of Tesla’s Giga Texas is predicted to extend to roughly 5.6 million sq. ft.
The information is simply the most recent in Tesla’s worldwide growth plans, and it comes forward of the automaker’s plans to provide the Cybertruck at its Texas facility later this yr. Tesla is already the most important manufacturing plant in Central Texas, and these expansions will enhance that lead whereas including essential, multi-step manufacturing tasks for the weather wanted to construct EVs.
Initially posted on EVANNEX. Written by Peter McGuthrie.
Associated Tales: Tesla To Construct 1,000 GWh Of Battery Cells Domestically, Over Double Whole World’s 2022 Output, Will Tesla Create An “Ecological Paradise” At Giga Texas?
Admire CleanTechnica’s originality and cleantech information protection? Take into account changing into a CleanTechnica Member, Supporter, Technician, or Ambassador — or a patron on Patreon.
Do not wish to miss a cleantech story? Join each day information updates from CleanTechnica on e-mail. Or observe us on Google Information!
Have a tip for CleanTechnica, wish to promote, or wish to counsel a visitor for our CleanTech Speak podcast? Contact us right here.